Clark-Reliance Jerguson 360 Series Instrukcja instalacji, obsługi i konserwacji - Strona 11
Przeglądaj online lub pobierz pdf Instrukcja instalacji, obsługi i konserwacji dla Jednostka sterująca Clark-Reliance Jerguson 360 Series. Clark-Reliance Jerguson 360 Series 12 stron. Safety ballcheck valves
®
Jerguson
360 Series
7. Place the new spiral-wound gasket on the underside of the inlet gland like shown. Place the new
upstream seat and seal into the inlet gland opening.
Inlet Gland
Spiral-Wound
Gasket
8. Insert the inlet gland assembly from the previous step into the valve as shown.
9. Secure valve into a vice with the large compression nut facing upward. Using a large calibrated
torque wrench, tighten compression nut to 500 Ft-Lbs. Install anti-rotation pin to lock nut in place.
The valve is now ready to be hydro-tested.
16633 Foltz Parkway ● Strongsville, OH 44149 USA ● Telephone: +1 (440) 572-1500 ● Fax: +1 (440) 238-8828
Seat Seal
Upstream Seat
11
www.Jerguson.com ● [email protected]
IOM J500.36
2017.10