Acorn AC-309 Instrukcja obsługi - Strona 6
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Wentylator Acorn AC-309. Acorn AC-309 12 stron.
INSTALLATION OF DOWN ROD / HANGER BALL:
5
1) Remove the 'R' pin and Cross pin
from the down rod (fig 3).
2) Install the canopy and housing
cover through the down rod then
thread the wires through the
down rod, insert the down rod
into the connector (fig 3).
fig 3
3) Loosen the two setscrews in the
down rod support. Install back
the Cross pin and secured with
the 'R' pin. The 'R' pin must be
properly installed to prevent the
Cross pin from working loose
(fig 4).
fig 4