Clarus ZF-800 Instrukcja obsługi - Strona 8
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Systemy filtracji wody Clarus ZF-800. Clarus ZF-800 20 stron. Treatment systems
Figure 11 - Typical Fusion
WARNING!
CLEANOUT
SEWER LINE
AIR LINES
CONDUIT INSTALLED
BY CONTRACTOR
WHERE APPLICABLE
BLOWER INSTALLATION AND PLACEMENT
1. The blower must be connected to a grounded, metallic, permanent wiring system, or an
equipment-grounding terminal or lead on the product.
2. Place the blower where it is easily accessible for maintenance and inspection.
3. Install the blower in an area where it will be protected from damage and inundation. Also
make certain the location has good ventilation.
4. Install the blower on a foundation that is level and solid.
5. Excavate trenches for two air lines from blower to the unit.
6. Install two separate 1/2" (13 mm) air lines from the blower to the unit. Length of piping
must be less than 17' (5 m). If distances from 17' (5 m) to 33' (10 m) are required, use
3/4" (19 mm) diameter piping (Figure 12). If longer air lines are needed, consult the
factory.
7. The blower is provided with two discharge ports. The blower label is color-coded with the
aeration outlet port being BLUE (main) and the backwash (skim) outlet port being RED
(Figure 12).
8. The air port inlets on the Fusion
backwash (Figure 12).
9. Attach the barbed end of each PVC tee (included in the blower box) to the blower using the
rubber elbows (Figure 12).
10. Attach the small diameter black air tubing (included in the blower box) to barbed fitting
on PVC tee. Black air tubing and blower power cord should be routed to the alarm panel
through conduit. Attach the two black air tubing lines to the two air pressure sensor barbed
fittings in the alarm panel (Figure 12).
11. Connect the remaining end of each PVC tee to the
airlines installed in Step 6.
12. Install the Fusion
blower at an elevation where the
®
air line outlets are located above the elevation of the
Fusion
air line inlets (Figure 12).
®
TO PREVENT ELECTRICAL SHOCK
FROM BACK-SIPHONING, LOCATE
THE PUMP ABOVE THE WATER
LEVEL.
Layout
®
FUSION ALARM PANEL
BLOWER
ALARM FLOAT
OPTIONAL SEPTIC TANK INSTALLATION
MAY BE REQUIRED BY LOCAL
OR STATE REGULATIONS
are also color-coded, BLUE for aeration and RED for
®
© Copyright 2020. All rights reserved.
Figure 12
BULK HEAD FITTINGS
FUSION UNIT
AIR LINE FROM PUMP
1/2" SCH 40 PVC
RED AIR
LINE
HIGH WATER FLOAT CONDUIT
TO BE INSTALLED BY
!
WARNING
HAZARD
ELECTRICAL SHOCK
CONTRACTOR
(WHERE APPLICABLE)
BLUE AIR
LINE
ALARM FLOAT
CONDUIT
AIR SENSOR LINE
8
RISER AND LID
FUSION
DRILL HOLES FOR
BLOWER MAKE UP AIR
DECORATIVE ROCK CONFIGURATION
INTERIOR CONFIGURATION
BLUE AIR
BLOWER
LINE
POWER
CORD
AIR LINE
TO PANEL
ADAPTER
CONDUIT TO PANEL
SPRING
SEAL AFTER LINE
CLAMPS
INSTALLATION
RUBBER
ELBOWS
AIR LINES
TO PANEL
RED AIR
LINE
BLOWER
GLUE
FITTINGS
1/2 X 3/4 REDUCER
INSTALL BUSHING IF AIR
LINE IS LESS THAN 17'
TO UNIT
TO DISPERSAL
sk2650
DRILL HOLES FOR
BLOWER MAKE UP AIR
DECORATIVE ROCK CONFIGURATION
INTERIOR CONFIGURATION
sk2639