Akron SAM BOOST Skrócona instrukcja obsługi - Strona 5

Przeglądaj online lub pobierz pdf Skrócona instrukcja obsługi dla Sprzęt przeciwpożarowy Akron SAM BOOST. Akron SAM BOOST 8 stron.

4. DISPLAY INSTALLATION
□ Remove Original Equipment Pressure Governor
□ Mount SAM BOOST™ Display with Adapter Plate
□ Replace Original Equipment Master Intake & Discharge Pressure Sensors
If Buzzer Included in Kit:
□ Remove Original Equipment Buzzer
□ Install SAM BOOST™ Display Buzzer
If Buzzer NOT Included in Kit:
□ Connect Buzzer into SAM BOOST™ Display
5. WATER TANK COMPONENT INSTALLATION
□ Install Pump Venting Solenoid to 1/4" NPT Port on Discharge Side of Pump
□ Install Check Valve Assembly to Water Tank or Discharge Side of Tank Fill Valve
□ Connect & Route 3/8" Push-On Hose Tubing between Solenoid & Check Valve
□ Locate & Remove OEM Water Tank Sensor
□ Install OEM Water Tank Sensor to SAM BOOST™ Tank Assembly
□ Install SAM BOOST™ Tank Assembly to Water Tank
6. ELECTRONIC MODULE INSTALLATION
□ Mount Matrix & Radio Modules to Valves
• Adapter fits 2.5", 3", or 4" Valves
7. HARNESS INSTALLATION
□ Connect all Harnesses shown on System Layout
□ Connect OEM Power & Ground to SAM BOOST™ Power & Ground
• Do NOT wire to circuit with heavy motor loads (such as primer, foam system)
• Wire to switched power source with 60 AMP protection on positive (+) side
8. WARNING LABEL & PLACARD INSTALLATION
□ Locate & Place Warning Labels where Preconnect Hoses are Deployed
□ Locate & Place Cover Placards over Original Valve Control Push Rods Panel Holes
Sheet: FSG-MNL-00233
SAM BOOST™ WITH SMART NOZZLE N
Refer to FSG-MNL-00232 for complete listing of Safety Hazards & Warnings
Revision 7 / 10 / 2023
QUICK START GUIDE
P
2
Page: 4 of 7