BARLOW TYRIE 9111210 Manual de instruções de montagem - Página 10

Procurar online ou descarregar pdf Manual de instruções de montagem para Mobiliário de pátio BARLOW TYRIE 9111210. BARLOW TYRIE 9111210 16 páginas. Pavilion with cabrio folding roof

Anchoring the pavilion
8
Make sure the structure is well aligned and levelled with the floor
as shown in the diagram below. Consult the section below for
recommendations on the type of anchorage required for fixing
the structure on the floor.
C1
level
Ground Fixing
Requirements:
8 (2 per plates) of each
- 5/16" x 2" wood screws
- 5/16" washers
The Permo Lock anchoring system is the recommended
method that offers a strong permanent solution for
anchoring your shelter and to protect it against the
wind. See next page for instructions on how to install this
anchor
www.teak.com
C3
C2
OPTION A
WOOD DECK/FLOOR
WOOD
BA R LO W T Y R I E
Remaining holes in
plate
(AL005)
are used
for fixing the structure
on the floor
Requirements:
8 (2 per plate) of each
- 3/8" x 1
" expansion anchor
1/2
* use 1/2" cement drillm bit
quality since 1920
L
W
D
Dimensions
inches (cm)
W
111 (282)
L
138 (350)
D
177 (450)
C1
79 (200)
C2
114 (290)
C3
144 (366)
Distances W, L, and D are calculated
from centre to centre of plates
OPTION B
CONCRETE/CEMENT FLOOR
Page 10 of 16
( AL005 )
CONCRETE
SOIL