Cold Jet PE80 Pré-instalação - Página 9
Procurar online ou descarregar pdf Pré-instalação para Equipamento industrial Cold Jet PE80. Cold Jet PE80 16 páginas. Dry ice manufacturing system – pelletizers
CO
battery
2
When operating our PE50 pelletizer from a battery, it is important to select the correct type of battery.
We need to use the upside-down version to keep an optimal production, as Dry ice is made from liquid.
These battery's come with a special outlet fitting and therefore it is crucial to get a reduction from the gas supplier. This
reduction must end with a 3/8" BSP 60° cone fitting. This should be connected to the inlet side of the pressure reducer.
(1)
The battery needs to be connected to a pressure reducer (TP700000) as the pressure is approx. 50 bars in the battery
and the pelletizers safety valve will open at 24,1 bar. We recommend having a working pressure between 16-18 bar on
the pelletizer.
The pressure reducing kit (TP700000) comes with a gas vent to optimize the flow of liquid to the pelletizer. The excess
gas must be carried outside for safety reasons together with the exhaust gas from the pellet
1. Inlet from battery
2. Shut-off valve
3. Inlet pressure gauge
4. Outlet pressure gauge
5. Adjustable knob for outlet pressure (16-18 bar)
6. Gas release
7. Outlet to PE50 pelletizer
Electrical Service & Supply
The Pelletizer requires a three-phase power supply. The power source must be grounded:
For machines in the US: use a Solidly Grounded WYE Source.
•
For machines outside US: use a TN-S grounding acc. to IEC 60364.
•
All phases must be balanced, and voltages must be within ±10%.
•
PE50 & PE80
Preinstallation manual
Version:
1
Page:
8 of 15
Date:
22.02.2023