Dover PSG MOUVEX SUBMERGED AM UNIT ON PLATE Instalação, operação e manutenção

Procurar online ou descarregar pdf Instalação, operação e manutenção para Bomba de água Dover PSG MOUVEX SUBMERGED AM UNIT ON PLATE. Dover PSG MOUVEX SUBMERGED AM UNIT ON PLATE 13 páginas. Submerged am unit on plate

Dover PSG MOUVEX SUBMERGED AM UNIT ON PLATE Instalação, operação e manutenção
Submerged AM
Submerged AM units on plate are covered 24 months by warranty within the limits mentioned in our General Sales Conditions.
In case of a use other than that mentioned in the Instructions manual, and without preliminary agreement of MOUVEX,
warranty will be canceled.
Z.I. La Plaine des Isles - F 89000 AUXERRE - FRANCE
Tel. : +33 (0)3.86.49.86.30 - Fax : +33 (0)3.86.49.87.17
[email protected] - www.mouvex.com
Unit on plate
WARRANTY :
INSTRUCTIONS 1010-I00 e
Section
1010
Effective
March 2018
Replaces
March 2017
Translation of the
original instructions
INSTALLATION
OPERATION
MAINTENANCE
Your distributor :