Follett Horizon Elite 1810 Series Manual de instruções de instalação - Página 5
Procurar online ou descarregar pdf Manual de instruções de instalação para Máquina de gelo Follett Horizon Elite 1810 Series. Follett Horizon Elite 1810 Series 13 páginas. Ice machine models with ride technology
Também para Follett Horizon Elite 1810 Series: Manual de início rápido (8 páginas), Manual de instruções de instalação (17 páginas), Manual (8 páginas)
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation is
not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
➊
• 120/60/1-5 amps
Potable water supply
➋
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable federal,
state, and local codes
➌
Drains:
3/4" Barb for silicone drain, 3/8" push-to-connect for chassis drain
• Minimum 8" radius on silicone drain line. Drain line from the ice machine must have at least 1/4" per foot
pitch (6,4mm/0,3m).
Refrigeration lines
➍
• 7/8" ∅ (22,4 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
BIN • TOP-MOUNT
➌
3/8"
drain must be
used
(3/8" push-in connection, 3/8" OD tubing required)
➎
remote condensing
chassis
➎
3/8" ∅ (9,5mm)
➍
7/8" ∅ (22,4 mm)
➍
➊
➋
1'
1/4" per foot
➌
(6,4 mm per 0,3 m)
➍
Site preparation
Minimum 8"
radius
2 ft. x 1" OD
silicone tubing
3/4" barb x 3/4" FPT
➌
3/4" MPT x 1" slip
1" Stand pipe/Drain
NEMA
5-15
2
5