Follett Horizon Elite HCD1410RJS Manual de instruções de instalação - Página 5
Procurar online ou descarregar pdf Manual de instruções de instalação para Máquina de gelo Follett Horizon Elite HCD1410RJS. Follett Horizon Elite HCD1410RJS 17 páginas. Ice machine models with ride technology
installation instructions for drop-ins
Também para Follett Horizon Elite HCD1410RJS: Manual (8 páginas), Manual (8 páginas)
Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation of
low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
➊
• 120/60/1-5 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water filtration system (item# 00130286)
• This equipment is to be installed with adequate backflow protection to comply with applicable
federal, state, and local codes
➌
Drain
(3/4" MPT)
• The drain line from the ice machine must have at least 1/4" per foot pitch (6,4 mm/0,3 m)
Refrigeration lines
➍
• 5/8" ∅ (15,8 mm) diameter suction line (insulated)
• 3/8" ∅ (9,5 mm) liquid line
DROP-IN • RIDE Technology
➋
(3/8" push-in internal connection, 3/8" OD tubing required)
➎
remote condensing
Site preparation
➎
3/8" ∅ (9,5 mm)
➍
➊
➋
1/4" per foot
(6,4 mm per 0,3 m)
➌
➍
2
5/8" ∅ (15,8 mm)
NEMA
5-15
5