Carmanah SPEEDCHECK-12 Manual de instalação - Página 10
Procurar online ou descarregar pdf Manual de instalação para Controlador Carmanah SPEEDCHECK-12. Carmanah SPEEDCHECK-12 14 páginas. Solar charge controller
Também para Carmanah SPEEDCHECK-12: Manual (8 páginas), Manual de substituição (10 páginas), Manual de substituição (12 páginas)
9. Install AI FCU onto mounting plate with three #8-32x1/4" screws.
10. Install screw mount cable tie around harness wires end secure to lower-left mounting plate standoff with
one #8-32x3/8" screw.
11. Install harness ground ring terminal onto stud shown and fasten with one nyloc nut. Orient as shown.
12. Thread GPS and LTE antenna coax harness connectors onto correct connectors on the AI FCU (not
shown below).
Yellow sensor wire will remain unterminated for AC-powered systems. For solar-powered
systems this will mate with the yellow wire from the solar kit. See
information.
13. Connect the 2-pin and 4-pin AI FCU connectors to the open receptacles on the display enclosure as
shown below. All 2-pin connectors are interchangeable.
Battery Only or AC w/ AI FCU
Carmanah Technologies Corp. | 250 Bay St, Victoria, BC V9A 3K5, Canada | 1.250.380.0052 |
APPLIED INFORMATION (AI) INTEGRATION
Section 4.3
Solar Kit w/ Battery & AI FCU
INSTALL GUIDE
Cell – Front
GPS – Rear
for more
10
|
carmanah.com