Airtec CYPRES Manual de instruções - Página 4
Procurar online ou descarregar pdf Manual de instruções para Instrumentos de medição Airtec CYPRES. Airtec CYPRES 17 páginas. Water resistant kit
First:
Right now every CYPRES that should be made water resistant has to see
Airtec or SSK.
There a generell check for all important properties is done and
• the control unit and
• the plug in the cutter cable and
• the lower part of the cutter and
• if existing a splice in the control unit cable
are sealed.
Looking at these items you will realise something like a transparent plastic
coating.
Please check the sealings when you easily have access.
Second:
• Only a CYPRES with undamaged cables can be made water resistant. Holes
or slits in cables will allow water to find a route through the inside of the
cables into the processing unit.
• After the assembly and testing of the water resistant housing, the silicone
needs 12 hours time to cure completely. Do not install the housing in a rig
before this time.
• The main processing unit pouch in the reserve container has to be changed
to the larger pouch. Please install the new (OD green) pouch according to
the instructions in the CYPRES Riggers Guide, page 9.
• As mentioned before, the mounting of the water resistant housing requires
concentrated work, which has to be done without any errors.
• Once installed, the water resistant version needs more maintenance and
care. Additionally, the volume of the AAD increases.
Because of the above reasons we strongly recommend installing a water
resistant CYPRES only when it is really needed and not "because it may be
better".
Thank you for your understanding.
Instruction Manual CYPRES Water Resistant Kit
Important Information
Airtec GmbH
page 4