Danfoss 176F4184 Manual de instalação - Página 13

Procurar online ou descarregar pdf Manual de instalação para Equipamento industrial Danfoss 176F4184. Danfoss 176F4184 14 páginas. In-back/out-back cooling kit for fk09a/fb09a and fk10a/fb10a

In-back/Out-back Cooling Kit for FK09a/FB09a and FK10a/FB10a
Installation Guide
4.
Attach the front duct cover by fastening 8 M5 nuts (8 mm).
Illustration 12: Front Duct Cover Installation

2.8 Installing the Top Cover

To install the top cover of the cooling kit, use the following steps. See
Procedure
1.
Remove the 2 eyebolts from the top of the frequency converter.
Keep the eyebolts for use when lifting the frequency converter.
2.
Remove 8 M5x14 screws (T25) surrounding the sides and back of the vent in the top of the frequency converter.
3.
Remove 3 M5x12 screws (T25) at the front of the vent in the top of the frequency converter.
Retain the screws from steps 2 and 3 for cover installation.
4.
Adhere the top cover gasket to the underside of the top cover.
5.
Position the top cover over the vent opening in the top of the frequency converter.
6.
Secure the top cover to the frequency converter with the screws removed in steps 2 and 3.
Torque to 2.3 Nm (20 in-lb).
Danfoss A/S © 2023.09
Illustration
13.
AN440656954288en-000101 / 136R0326 | 13
Installation