BENDIX SD-08-2418 Manual - Página 4
Procurar online ou descarregar pdf Manual para Desumidificador BENDIX SD-08-2418. BENDIX SD-08-2418 17 páginas.
Oil Coalescing Filter
(Bendix
AD-IS
®
PuraGuard
coalescing air dryer)
Delivery
Purge
Control
Channel
Governor
Unloader
Port
Supply
Port
Purge
Valve
(closed)
Engine
Compressor
Figure 2 - Bendix
AD-IS
®
CHARGE CYCLE
(Refer to Figure 2.)
When the compressor is running loaded (compressing air),
compressed air flows through the compressor discharge
line to the inlet (1/IN) port of the air dryer body. The
compressed air often includes contaminates such as oil,
oil vapor, water, and water vapor.
Traveling through the discharge line and into the air dryer,
the temperature of the compressed air falls, causing
some of the contaminants to condense and drop to the
bottom of the air dryer and purge valve assembly. These
contaminants are ready to be expelled at the next purge
cycle. The air then flows into the desiccant cartridge,
where it flows through an oil separator – or coalescing
filter if equipped with a Bendix
cartridge – which removes water in liquid form, as well as
liquid oil and solid contaminants.
4
Desiccant
Bed
®
oil
®
Check
Valve
(open)
Turbo
Safety
Cut-Off
Valve
Valve
Secondary
(open)
Turbo
Port
(SEC)
See
Note 1
Air Dryer & Reservoir System Charge Cycle
®
PuraGuard
oil coalescing
®
®
Pressure
Protection
Valves
A
C
B
Primary
Port (PRI)
Primary
Reservoir
Auxiliary Ports
(To Accessories)
Air then flows into the desiccant drying bed and becomes
progressively drier as water vapor adheres to the desiccant
material in a process known as adsorption.
Dry air exits the desiccant cartridge, through the center
of the base assembly, then flows to the delivery check
valve, through an orifice, and into the purge reservoir. The
delivery check valve opens, supplying air to the pressure
protection valves (A) through (D) simultaneously, the
safety valve, and also to the reservoir port of the attached
governor. The purge reservoir fills, storing air that will be
used to regenerate the desiccant during the purge cycle.
This air is available to supply downstream components
during the charge mode.
When the air pressure reaches approximately 106 psi, the
four pressure protection valves will open and air will be
supplied to the primary reservoir, secondary reservoir, and
Purge
Purge
Orifice
Reservoir
D
Purge
Reservoir
Drain Valve
Secondary
Reservoir
Diagram shows all pressure
protection valves open
.