BENDIX SD-08-2418 Manual - Página 5

Procurar online ou descarregar pdf Manual para Desumidificador BENDIX SD-08-2418. BENDIX SD-08-2418 17 páginas.

BENDIX SD-08-2418 Manual
Oil Coalescing Filter
(Bendix
AD-IS
®
PuraGuard
coalescing air dryer)
Purge
Control
Channel
Governor
Unloader
Port
Supply
Purge
Port
Valve
(Open)
Compressor
Figure 3 - Bendix
AD-IS
®
accessories. If the pressure protection valves are pre-set
to different values, the valves will open – in order of lowest
setting to highest setting – when charging a flat system.
The air dryer and purge reservoir will remain in the charge
cycle until the air brake system pressure builds to the
governor cut-out setting of approximately 130 psi.

PURGE CYCLE

(Refer to Figure 3.)
When air brake system pressure reaches the cut-out setting
of the governor, the governor unloads the compressor
activating the purge cycle of the air dryer & reservoir.
The governor unloads the compressor by allowing air
pressure to fill the line leading to the compressor unloader
mechanism. This suspends the delivery of compressed air
to the Bendix
AD-IS
air dryer & reservoir system.
®
®
Desiccant
Bed
®
oil
®
Delivery
Check
Valve
(open)
Safety
Turbo
Valve
Cut-Off
Valve
Engine
Secondary
(Closed)
Turbo
Port (SEC)
Exhaust
Air Dryer & Reservoir System Purge Cycle
®
Pressure
Protection
Valves
A
C
B
Primary
Port (PRI)
Primary
Reservoir
Auxiliary Ports
(To Accessories)
Similarly, the governor also supplies air pressure to the
air dryer. The pressure also moves the air dryer purge
piston down, opening the purge valve to atmosphere
and closing off the compressor air supply to the turbo
cut-off valve (covered in the Turbo Cut-off Valve section
of this document). Water and contaminants captured are
expelled immediately when the purge valve opens. In
addition, air – which was flowing through the desiccant
cartridge – changes direction and begins to flow toward
the open purge valve. Contaminants collected by the air
dryer are removed by air flowing from the purge reservoir
through the desiccant drying bed to the open purge valve.
The initial purge and desiccant cartridge decompression
lasts only a few seconds, evidenced by an audible burst
of air at the air dryer exhaust.
Purge
Purge
Reservoir
Orifice
D
Purge
Reservoir
Drain Valve
Secondary
Reservoir
Diagram shows all pressure
protection valves open
.
5