6K Products 25G36 Manual de operação e peças - Página 10
Procurar online ou descarregar pdf Manual de operação e peças para Equipamento industrial 6K Products 25G36. 6K Products 25G36 17 páginas. Connect and cut hydraulic chain
Operating Instructions
Before, and periodically during, operation you must check the bar oil level and chain tension. We recommend using
a good quality bar oil of the correct viscosity for your areas operating temperatures. Because of the wide
temperature range between winter and summer two different viscosity oils may be required. Tension the chain as
described on page 6. The log being cut must be clamped prior to sawing. Once the log is positioned and clamped the
saw control valve needs to be opened for full flow to cut. After completing the cut reverse the valve and raise the
saw bar. The saw motor only runs when the bar is being lowered. The bar will only receive up to 32 cc of oil when
the saw motor is operating or the bar is feeding down.
Parts and Service Information
For parts and service contact 6K Products. Our hours of operation are 8:00 AM to 4:30 PM, Monday through Friday,
Pacific Time excluding holidays.
Phone: 360-264-2141
Fax: 360-264-5105
Email
Mail and shipping address:
6K Products
1006 143
Ave. S.E.
rd
Tenino, WA 98589
10