HIBLOW HP Series Manual - Página 2
Procurar online ou descarregar pdf Manual para Bombas para lagos HIBLOW HP Series. HIBLOW HP Series 8 páginas.
Também para HIBLOW HP Series: Manual (5 páginas), Manual (9 páginas), Manual de início rápido (7 páginas)
HP- 150 / 200
CAUTION
!
●Be sure to unplug the pump unit.
●Replace the diaphragms and the valves with new ones at least once a year to one and
a half year regularly in order to maintain their initial performance.
●For chamber block replacement, be sure to change both chamber blocks at the same
time.
●The rod employs powerful permanent magnets. Therefore, be sure to remove your
watch and any other precision machines before operation as they may be affected by
the strong magnetic force.
●Do not put the actuating rod close to a magnetic card, magnetic disk or other magnetic
media as the data may be destroyed.
STEP
STEP
REMOVAL OF THE CHAMBER BLOCKS
1
1
To remove the upper housing.
(Refer to REMOVING UPPER HOUSING )
Remove the sound absorber.
STEP
STEP
2
2
Pull out the L-tube from the casing block.
STEP
STEP
3
3
Remove the 4 screws holding the chamber block
and the casing block.
(4 screws on each side)
2
REPLACING THE CHAMBER BLOCK