Celec ES-09 Manual de instalação no terreno - Página 7
Procurar online ou descarregar pdf Manual de instalação no terreno para Cortador Celec ES-09. Celec ES-09 10 páginas.
ES-09
Field Installation Manual
Connection Type#2
Use these instructions
If 63 Amp circuit breaker is unavailable, existing blanks are available.
ES-09 unit is designed for use with Customer Main Breaker Panel Single Phase 240V AC
up to 400 Amp.
ES-09 units should be mounted with four appropriate sized fasteners before connect to Main Breaker
Panel.
1. Remove Main Panel covers exposing internal wiring and breakers.
2. Remove existing 2 Pole breaker blanks and install new 2 Pole 63 Amp circuit Breakers.
3. For rest of connection follow the Connection type#1 on page 5.
______________________________________________________________________________________
-7-