Hidro-Water ATHENEA Manual - Página 7

Procurar online ou descarregar pdf Manual para Sistemas de filtragem de água Hidro-Water ATHENEA. Hidro-Water ATHENEA 16 páginas.

Here is a diagram of how the ultrafiltration system should be installed.

5.- ULTRAFILTRATION SYSTEM START UP

a. Unscrew the back of the system, lift the lid
and pull out.
b. Make sure that all the connections are
connected properly and tightened.
c. Make sure that the arm of the WATER STOP
Antileak system is down like shown in the fig-
ure so that the water can enter the ultrafiltra-
tion system.
d. Open the water supply and then the ball
valve (figure 5) as shown. Make sure there
is no water leak. If there is, close the valve
and fix it.
e. Open the faucet (Figure 2) and let all of the air out from inside the ultra-
filtration system. Once a continual water flow comes out of the faucet,
let it run for 30 seconds and then close the faucet. If in the beginning,
the water runs black, don't worry, this is normal, it's caused by the resi-
due that the granulated carbon filter lets off. Drain this water. The water
will run clear not long after this.
f.
Raise the arm on the WATER STOP An-
tileak system and place one of the pieces
of the absorbent material supplied with the
WATER STOP Antileak system. Keep the
other one safe as a spare part. Lower the
arm of the system so that water can enter
the ultrafiltration system.
7
ref: MA-UF-0002-EN-V14.0-ATHENEA.pdf