Galleon SIGNALCLOCK V2 Manual de instalação e do utilizador - Página 6

Procurar online ou descarregar pdf Manual de instalação e do utilizador para Relógio Galleon SIGNALCLOCK V2. Galleon SIGNALCLOCK V2 19 páginas.

INSTALLATION

The mounting instructions slightly differ for the 4-digit and 6-digit models due to their different
dimensions. Please follow the instructions that are relevant for your SignalClock model.

MOUNTING THE 4-DIGIT MODEL

1. Locate the two slots on the back of the clock that allow the clock to be mounted to the
wall using two screws.
2. Measure a horizontal line of exactly 300mm in the area of your choice, the end points of
which represent the drilling locations for the screws.
3. Drill the holes and insert wall plugs into the wall to prevent the screws from coming loose.
4. Fit the screws into the plugs.
5. When the clock is ready, connect the Ethernet cable to the rear of the clock and hang it on
the wall.

MOUNTING THE 6-DIGIT MODEL

1. Locate the two slots on the back of the clock that allow the clock to be mounted to the
wall using two screws.
2. Measure a horizontal line of exactly 480mm in the area of your choice, the end points of
which represent the drilling locations for the screws.
3. Drill the holes and insert wall plugs into the wall to prevent the screws from coming loose.
4. Fit the screws into the plugs.
5. When the clock is ready, connect the Ethernet cable to the rear of the clock and hang it on
the wall.
www.galsys.co.uk
galleonsupport.com
SIGNALCLOCK V2 Manual
6
TEL:
+44 (0) 121 608 4433
FAX:
+44 (0) 121 608 4477