Gree Versati II Series Manual de serviço - Página 17

Procurar online ou descarregar pdf Manual de serviço para Bomba de calor Gree Versati II Series. Gree Versati II Series 18 páginas. Air-to-water heat pump monobloc versati
Também para Gree Versati II Series: Manual (13 páginas)

Gree Versati II Series Manual de serviço
Charging
valve 1
Notes
Discharge is allowed unless the unit has been stopped. (Cut off the power and repower it 1 minutes
later)
Protective measures should be taken during discharging to avoid frost bites.
When discharging is finished, if vacuuming cannot be done immediately, remove the hose to avoid air or
foreign matters entering the unit.
(2) Vacuuming: When discharging is finished, use hoses to connect the charging valve, manometer and
vacuum pump to vacuum the unit.
Note: when vacuuming is finished, pressure inside the unit should be kept lower than 80Pa for at least 30
minutes to make sure there is no leak. Either charging valve 1 or charging valve 2 can be used for vacuuming.
(3) Charging: when vacuuming is finished and it is certain that there is no leak, charging can be done.
Be sure to charge the specified amount of refrigerant in liquid state.
Since this refrigerant is a mixed refrigerant, adding it in gas form may cause the refrigerant composition to
change, preventing normal operation.
Before charging, check whether the refrigerant cylinder is equipped with a siphon tube or not.
With siphon tube
Test Operation & Troubleshooting & Maintenance
Connection Pipe
Vacuum pump
15
Pressure Meter
No siphon tube
Charging
valve 2