Gree Versati II Series 서비스 매뉴얼 - 페이지 17
{카테고리_이름} Gree Versati II Series에 대한 서비스 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gree Versati II Series 18 페이지. Air-to-water heat pump monobloc versati
Gree Versati II Series에 대해서도 마찬가지입니다: 매뉴얼 (13 페이지)
Charging
valve 1
Notes
Discharge is allowed unless the unit has been stopped. (Cut off the power and repower it 1 minutes
①
later)
Protective measures should be taken during discharging to avoid frost bites.
②
When discharging is finished, if vacuuming cannot be done immediately, remove the hose to avoid air or
③
foreign matters entering the unit.
(2) Vacuuming: When discharging is finished, use hoses to connect the charging valve, manometer and
vacuum pump to vacuum the unit.
Note: when vacuuming is finished, pressure inside the unit should be kept lower than 80Pa for at least 30
minutes to make sure there is no leak. Either charging valve 1 or charging valve 2 can be used for vacuuming.
(3) Charging: when vacuuming is finished and it is certain that there is no leak, charging can be done.
Be sure to charge the specified amount of refrigerant in liquid state.
◆
Since this refrigerant is a mixed refrigerant, adding it in gas form may cause the refrigerant composition to
change, preventing normal operation.
Before charging, check whether the refrigerant cylinder is equipped with a siphon tube or not.
◆
With siphon tube
Test Operation & Troubleshooting & Maintenance
Connection Pipe
Vacuum pump
15
Pressure Meter
No siphon tube
Charging
valve 2