Centrometal Bio-Tec 25 Manual técnico - Página 13
Procurar online ou descarregar pdf Manual técnico para Caldeira Centrometal Bio-Tec 25. Centrometal Bio-Tec 25 17 páginas.
![Centrometal Bio-Tec 25 Manual técnico](/uploads/products/server2/2045392/2045392.jpg)
- 1. Technical Data
- 2. Delivery Package
- 3. Additional Equipment
- 4. Cleaning and Maintenance of the Boiler
- 5. Connection to the Chimney
- 6. Boiler Use
- 7. Connection to the Central Heating System
- 8. Boiler Start up
- 9. Boiler Thermal Protection
- 10. Thermal Fuse
- 11. Electric Connection
- 12. Boiler Regulation
Electric connection, boiler start up
Scheme 4. - Electrical connection of a ordinal terminal on the boiler
ordinal terminal
N N L
L
L
N L
N L
W
W W
1
2
Supply
P
P
P
Fan
1
2
Relay output
230V
max. 216 W
01-05 - Sensors
01 - Boiler sensor
02 - Flue gases sensor
03 - First accumul.-upper sensor
04 - Sanitary water tank sensor
05 - Last accumul.-lower sensor
9.0. BOILER START UP
Boiler must not be used in flammable and explosive environment. It must not be
used by children or disabled persons (either physically or mentally), as well as by
person without knowledge or experience, unless they are under control or trained
by s person responsible for their safety. Children must be supervised in the vicinity
of the product. Protective gloves must be used (Image 9). Fuel with max. 25%
moisture content may be used.
Before starting up it is necessary to check following:
- if the boiler is connected to the central heating system throught one or more water
accumulator/s, through the appropriate pump/s and 3-way thermic valve like
ESBE VTC 512 (maintains minimum temperature of return water into the boiler
above 60°C), VTC 531 (maintains minimum temperature of return water into the
boiler above 60°C), LTC 141 (keep minimal temerature of return water into the
boiler above 60°C) or Laddomat 21 (maintains minimum temperature of return
water into the boiler above 63°C) according to this manual.
- if the fresh air access to the boiler room is available (Point 4.0).
- if the boiler and the whole system are properly filled with water and airvented.
- if the safety elements are properly connected and are functioning perfectly:
- closed central heating systems should have safety valve of max. 2,5 bar, thermal
safety valve and expansion vessel of min. volume which is not less then 10% of the
total water quantity in the system.
- open central heating systems should have an open expansion vessel of min.
volume which is not less then 7% of the total water quantity in the system situated
enough over the level of the highest radiator in the system and insulated, if it is
mounted outside of heated space.
- if the mobile elements of the boiler are properly positioned:
- sheet metal protecting cover (ZL-page 3) have to be fixed to the carriers in the
upper combustion chamber.
20
ordinal terminal
1 2 3 4 5 6 7 8 9 10 111213141516
3
3
01
02
03
04
05
Room thermostat
1 2 3 4 5
Room thermostat
Technical manual Bio-Tec
Connection to the closed central heating system
Scheme 2.1. - Closed central heating system with 3 or more water accumulators
1 - Boiler Bio-Tec
"
"
2 - "CAS" water accumulator
3 - 3-way thermic valve ESBE VTC 512, (maintains
minimum temperature of return water into the boiler
above 60°C), VTC 531 (maintains minimum temperature
of return water into the boiler above 60°C), LTC 141
(maintains minimum temperature of return water into
the boiler above 60°C) or Laddomat 21 (maintains
minimum temperature of return water into the boiler
above 63°C)
4 - Manual 3-way mixing valve
5 - Room thermostat (included into basic delivery)
6 - Heating circuit
7 - Expansion vessel for closed systems
(approx. 10% of the total volume of installation)
8 - Sanitary water accumulator
(SKB-Digi/LKB-Digi/TB/STEB)
9 - Pump 1 - boiler pump
10 - Pump 2 - heating pump
11 - Pump 3 - hot sanitary water pump
12 - Thermal safety valve
13 - Safety-airvent unit
13
bar
2
12
1
7
9
3
Technical manual Bio-Tec
6
5
T
T
T
T
10
11
4
2
2
8
13