Kohler 20341T-PNE-CP Manual de instruções de instalação - Página 7
Procurar online ou descarregar pdf Manual de instruções de instalação para Produto de canalização Kohler 20341T-PNE-CP. Kohler 20341T-PNE-CP 10 páginas. Pneumatic in-wall tank with frame short height
A4) INSTALLATION OF TOILET
1. Fit the flush pipe connector to the flush pipe inlet
on the toilet.
2. Fit the waste pipe connector to the waste pipe
outlet on the toilet.
3. Mark on the pipe connectors the position of
the rear of the toilet.
4. Remove the pipe connectors.
5. Mark on the pipe connectors a second line,
which represents the connection distance required
to connect the toilet to the flush and waste
pipes within the wall. This connection distance is
the distance between the rear of the tank and the
hole in the gib board.
6. Cut both the waste pipe and flush pipe at the connection distance marks.
7. Remove all burrs from the cut edges and reinstall on the toilet.
8. Fit the flush pipe connector and seal to the flush
pipe inlet on the toilet.
9. Fit the waste pipe connector and seal to the
waste pipe outlet on the toilet
10. Place the toilet onto the fixing bolts. (Ensure the toilet is supported at all times.)
11. Fit the rubber gasket, nut and decorative cap onto the fixing screws to secure
the toilet in place.
12. Ensure the toilet is level.
Level
B) REMOVAL AND MAINTEANCE OF CISTERN COMPONENTS
1. First unlock the faceplate from the mounting frame.
2. Remove the full flush airhose and reduced flush airhose. Then remove the faceplate.
Connection
to air hose
1310920-A02-A
Screw cover
Toilet fixing bolt
Rubber cover
Mark showing position
of toilet rear
Connection distance
Reserved space
Inlet pipe Seal
Inlet pipe
Waste pipe
connector
Waste pipe
connector seal
48mm-58mm
Gasket
Nut
Decorative cap
Faceplate
-7 -
Inlet pipe
Waste pipe
connector
Inlet pipe
Waste pipe
connector
Long screw
Lubricant
Faceplate