Kohler BodySpa K-1000 Manual de instruções de instalação - Página 12

Procurar online ou descarregar pdf Manual de instruções de instalação para Luminárias de casa de banho Kohler BodySpa K-1000. Kohler BodySpa K-1000 28 páginas. Tower custom hydro-massage system
Também para Kohler BodySpa K-1000: Manual do Proprietário (48 páginas)

Kohler BodySpa K-1000 Manual de instruções de instalação
IMPORTANT! You have now completed the initial roughing-in phase of the
BodySpa installation. Keep these instructions with the door enclosure so they
are readily available following the completion of finished wall construction.
C. COMPLETE THE FINISHED WALL
CAUTION: Risk of product damage. Use
extreme care to avoid scratching the wall jambs.
TE:
NO
The total finished wall thickness, including furring
strips, cement board, and finished wall material, must not
be more than 1-1/2".
Install cement board no more than 1/4" above the top of
the footbath rim.
Apply a bead of silicone sealant to the seam between the
cement board and the footbath.
Install the finished wall material.
For keypad installations that do not use the supplied outlet
box, refer to Step C. on Page 8 for installation
requirements.
Use a sharp utility knife to carefully score and remove the
protective tape from the wall jambs and center expanders.
AB
116290-2-
Bead of
Silicone
Sealant
Between
Cement
Board and
Footbath
1-1/2"
MAX.
Finished
Wall
1/2" Cement
Board
Galvanized
Nail Or
Screw
12
1/4"
MAX.
Furring Strip
TOP VIEW
Kohler Co., Kohler WI U.S.A.