Kohler BodySpa K-1000 설치 지침 매뉴얼 - 페이지 12
{카테고리_이름} Kohler BodySpa K-1000에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler BodySpa K-1000 28 페이지. Tower custom hydro-massage system
Kohler BodySpa K-1000에 대해서도 마찬가지입니다: 주택 소유자 매뉴얼 (48 페이지)
IMPORTANT! You have now completed the initial roughing-in phase of the
BodySpa installation. Keep these instructions with the door enclosure so they
are readily available following the completion of finished wall construction.
C. COMPLETE THE FINISHED WALL
CAUTION: Risk of product damage. Use
extreme care to avoid scratching the wall jambs.
TE:
NO
The total finished wall thickness, including furring
strips, cement board, and finished wall material, must not
be more than 1-1/2".
Install cement board no more than 1/4" above the top of
the footbath rim.
Apply a bead of silicone sealant to the seam between the
cement board and the footbath.
Install the finished wall material.
For keypad installations that do not use the supplied outlet
box, refer to Step C. on Page 8 for installation
requirements.
Use a sharp utility knife to carefully score and remove the
protective tape from the wall jambs and center expanders.
AB
116290-2-
Bead of
Silicone
Sealant
Between
Cement
Board and
Footbath
1-1/2"
MAX.
Finished
Wall
1/2" Cement
Board
Galvanized
Nail Or
Screw
12
1/4"
MAX.
Furring Strip
TOP VIEW
Kohler Co., Kohler WI U.S.A.