Kohler BodySpa K-1000 설치 지침 매뉴얼 - 페이지 9

{카테고리_이름} Kohler BodySpa K-1000에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler BodySpa K-1000 28 페이지. Tower custom hydro-massage system
Kohler BodySpa K-1000에 대해서도 마찬가지입니다: 주택 소유자 매뉴얼 (48 페이지)

Kohler BodySpa K-1000 설치 지침 매뉴얼
D. CONNECT VARIABLE FLOW VALVE
ASSEMBLY TO PUMP
Loosen the variable flow valve assembly by unthreading
the union nut. Reposition the variable flow valve assembly
so the outlet union lines up with the mounting frame union
nut. Securely handtighten the union nut. Be sure the union
O-ring is in place. Do not apply sealant to the union.
Handtighten the mounting frame union nut to the variable
flow valve union. Be sure the union O-ring is in place. Do
not apply sealant to the union.

7. ELECTRICAL CONNECTIONS

WARNING: Risk of electrical shock. To reduce
the risk of electric shock, connect only to a properly
grounded, grounding-type receptacle, protected
by a Ground-Fault Circuit-Interrupter (GFCI). Do
not remove the plug's grounding pin. Do not use a
grounding adapter.
The Kohler BodySpa is equipped with a cord and plug.
All wiring of the pump and control has been completed
at the factory. A licensed electrician must install a
GFCI-protected, 120 V, 20 A, grounded outlet. The
BodySpa may then be plugged into this outlet. No other
load should be on this circuit. Locate the outlet behind
the BodySpa, and within 24" of the pump.
* For bonding in accordance with national and local
codes.

8. INSPECT CONNECTIONS

Check all electrical connections.
Open the hot and cold water valves, and check all supply
connections for leaks. Fill the footbath to the overflow,
and check the overflow and drain connections for leaks.
Kohler Co., Kohler WI U.S.A.
Mounting
Frame
Variable Flow
Valve Assembly
Pump
Bonding
(Earthing)
Lug*
9
Mounting
Frame
Union Nut
BACK VIEW
20 A
Plug-in
Receptacle
Cord
Pump
Control Box
116290-2-
AB