Kohler BodySpa K-1000 Manual de instruções de instalação - Página 21

Procurar online ou descarregar pdf Manual de instruções de instalação para Luminárias de casa de banho Kohler BodySpa K-1000. Kohler BodySpa K-1000 28 páginas. Tower custom hydro-massage system
Também para Kohler BodySpa K-1000: Manual do Proprietário (48 páginas)

Kohler BodySpa K-1000 Manual de instruções de instalação
Securely handtighten the tower union nut to the mounting
frame union. Be sure the union O-ring is in place.
Carefully pivot the tower closed. Line up the holes at the
top and bottom right corners of the tower with the slotted
holes in the mounting frame. Thread a 3/8" bolt through
the mounting frame and into the tower at the top and
bottom. Tighten the bolts securely, but do not overtighten.
Water testing and inspection is required later. You may
want to only install and handtighten one of the required
bolts at this time. Both bolts will need to be securely
tightened later.

12. COMPLETE INSTALLATION

A. INSTALL HANDLES AND SPOUT
CAUTION: Risk of property damage. The valve,
spout, and other plumbing fittings must be
adequately sealed to prevent water leakage
behind the finished wall.
Install the faucet handles and spout according to the
manufacturer's instructions. Seal around the plumbing
fittings.
Kohler Co., Kohler WI U.S.A.
Mounting
Frame
Union
To Improve Clarity, the Door
Enclosure is not Shown.
21
Tower
Union
Nut
Bolt
Bolt
AB
116290-2-