Dextra Tanek Instalação

Procurar online ou descarregar pdf Instalação para Equipamento de iluminação Dextra Tanek. Dextra Tanek 2 páginas.

Tanek Installation
220-240V / 50-60Hz
IP65
IK10
1.
Carefully unpack the luminaire and undo the
10 x M5x20 socket screws in the frame and lift the
entire frame from the housing.
3.
Drill suitable fixings to suit required installation.
NOTE: IT IS THE CONTRACTORS RESPONSIBILITY TO
ENSURE THE HOLES ARE SEALED.
FAILURE TO SEAL THE HOLES WILL INVALIDATE
THE LUMINAIRE'S IP RATING.
5.
Reconnect the plug to the tray leaving sufficient cable
length to reach.
DIL-71-0002
WARNING: Luminaire must be earthed. Risk of electric shock from LED boards if operated with cover
removed. Installation / operation outside of luminaires intended scope invalidates warranty. Suitable only for
Terminal Labelling:
domestic / light industrial / industrial applications within the scope of EN55015. Tested to compliance with
Power
BSEN 60598: specification for general requirements and tests. Must be installed by a suitably qualified person
L1
Switched Live
E
Earth
in accordance with all relevant legislation. Ambient operating temperature of 0°C to 25°C. If maximum
N
Neutral
operating temperature is exceeded luminaire will automatically dim / switch off. Terminal blocks are rated to
Emergency
16A unless stated otherwise. The light source is non replaceable. LUMINAIRES WITH EMERGENCY PACK:
L2
Unswitched Live
When supply is isolated battery output terminals may be live if battery is connected. Isolate mains and battery
DA/AT3
DALI Autotest
before servicing. Emergency luminaires require unswitched live connection taken from same phase as
DA/AT3
DALI Autotest
switched supply. When unswitched supply is connected status indicator illuminates green, when unswitched
Dimming
-/D1/DA
Analogue/DSI/DALI
supply is disconnected indicator extinguishes and luminaire operates in emergency mode. 24 hour charge
+/D2/DA
Analogue/DSI/DALI
period required before undertaking full discharge test. Emergency test sheets provided should be used to
L3
Switch Dim /
record all emergency tests. Batteries should be replaced when 3 hour duration is not met. Excessive switching
Corridor Function
of permanent live may result in premature battery failure. Battery electrolyte can be harmful to eyes / open
wounds, do not puncture, if electrolyte touches skin / eyes flush with water. Do not incinerate batteries.
Revision - E
2.
Undo the 2 x M4x10 machine screws in the ends of
the gear tray as show in the image and remove the
gear tray from the housing.
4.
Remove the female socket from the tray as shown
and hard-wire to the mains supply.
6.
Carefully return the gear tray into the housing and
secure into place with the 2 x M4x10 machine screws
provided. Ensure the mains cable does not become
trapped when doing so.