Dextra Tanek Instalação - Página 2
Procurar online ou descarregar pdf Instalação para Equipamento de iluminação Dextra Tanek. Dextra Tanek 2 páginas.
Tanek Installation
7.
Feed the toggles on the tether wires through one of
the 7mm rounds on the end brackets inside the
housing. Hole location as shown to the right.
9.
11.
13.
DIL-71-0002
8.
Reverse step 1 to secure the frame back onto the
housing. Do not over tighten the socket head screws
when replacing the frame. Tighten sufficiently so to
provide a seal between the frame gasket and the
housing.
10.
12.
14.
Revision - E
13/12/2022