3 Day Blinds 2 Começar a trabalhar - Página 5

Procurar online ou descarregar pdf Começar a trabalhar para Estores de janela 3 Day Blinds 2. 3 Day Blinds 2 8 páginas.

BLIND INSTALLATION

• If you have not already done so unwrap the cellophane from
around the blind stack. Caution: DO NOT cut the cellophane
as the cords or ladders supporting the blind may be
inadvertently cut.
• Insert the headrail into the end brackets, making sure that
no cords or slats are in the way.
• Close the hinges on the end brackets until you hear them
"snap."
• While supporting the bottom of the blind, unwind the draw
cords and gently lower the blind to its full length.
Proceed to "Valance Installation."
5
| 2 & 2
/
" Wood & Faux Wood & Angled Slat Blinds
1
2
• If you ordered a blind with
a valance, you will need to
install the valance clips to
the front of the headrail
before installing the blind
following the "Valance
Clip Installation" section.
• Be sure the hinged end
brackets are in the open
position.
VALANCE INSTALLATION
You will need to have installed the blind following the "Blind
Installation" section before installing the valance.
Up into Clip on Head Rail
Behind Valance
• Aligning the front and back of each of the valance clips and
slide the valance onto the headrail.
• Once attached adjust the valance to the desired height by
sliding it up or down.