360 Yield 360 Y-DROP JOHN DEERE 4730 Manual de instruções - Página 5

Procurar online ou descarregar pdf Manual de instruções para Equipamento agrícola 360 Yield 360 Y-DROP JOHN DEERE 4730. 360 Yield 360 Y-DROP JOHN DEERE 4730 11 páginas.

INSTALL NEW SQUARE TUBE
III.
BRACKET ON OEM PRIMARY BOOM
Figures 6 and 7
To prepare for the steps that follow, you will need
to drill a 7/16" hole 84" +/-6" from the pivot pin on
the OEM Primary boom (1). This will allow for the
installation of the second mounting position of the
U-bolt on the rear OEM boom.
Figure 8
Step 1
With the threads pointing down, install
U-bolt (1) on front OEM boom. Install
bracket assembly (2) and the nuts onto
the front OEM boom.
Bag AA
Step 2
With the threads pointing down, install
U-bolt (3) over the rear OEM boom. Install
bracket assembly (4) and nuts onto the rear
OEM boom.
Bag EE
Step 3
Install extension tube (5) into bracket
assemblies (2) and (4).
Step 4
Install 360 Y-DROP boom bracket (6) onto
extension tube (5).
Bag BB
Step 5
Install set screw (7).
Hardware Kit A within Bag BB
Figure 9
Step 6
Install set screws (8).
P/N 207042 Hardware Kit D
within OEM Boom Bracket Kit
Step 7
Install stop bolt assemblies (9) at the
front and rear of the extension tube.
Hardware Kit B within Bag BB
Repeat Steps 1-7 for the remaining sprayer
mount packages.
INSTRUCTIONS 360 Y-DROP
Figure 6
Figure 7
3
1
2
Figure 8
9
Figure 9
360YIELDCENTER.COM
JOHN DEERE 4730/4830
1
7/16"
5
4
6
7
8
5