ALLpaQ Packaging Group Genesis 500 Manual do Utilizador do Operador - Página 6

Procurar online ou descarregar pdf Manual do Utilizador do Operador para Equipamento de embalagem ALLpaQ Packaging Group Genesis 500. ALLpaQ Packaging Group Genesis 500 13 páginas.

ALLpaQ Packaging Group Genesis 500 Manual do Utilizador do Operador
Once the panel has been released allow the panel to be lowered into the box using both hands.
Fig 11.5
1.12 Moving the container to storage area.
Please refer to instruction point 1.6 (refer to Fig 6.1 and 6.2).

Chapter 2 - ALLpaQ Genesis 1000 operational Instructions

2.1 Moving the Container
As with the ALLpaQ Genesis 500L container the pallet base allows for 4 way entry (Fig 1.2) when
using a pallet jack or fork lift truck. Material handling equipment using forks which lift from the legs
must use the 2 way entry front and rear (Fig 1.1).
Repeat the procedure with the opposite short panel.
Fig 11.3
The lid should then be fitted to the folded container.
Note that the red locking catches may be in the locked
position before operation. (Fig 11.5).
Fig 1.1
Manual V1 - (Sept 14
Starting with either of the
remaining long sided panels,
Fig 11.4
lower the panel folding towards
the centre (Fig 11.3).
Repeat the process for the last
side panel ( Fig 11.4)
th
2012)
Fig 1.2