Cisco 3020 - Cisco Catalyst Blade Switch Manual de instalação - Página 6

Procurar online ou descarregar pdf Manual de instalação para Hardware de rede Cisco 3020 - Cisco Catalyst Blade Switch. Cisco 3020 - Cisco Catalyst Blade Switch 21 páginas. Release notes for the cisco catalyst blade switch 3020 for hp, ciscoã‚â iosã‚â releaseã‚â 12.2(44)se
Também para Cisco 3020 - Cisco Catalyst Blade Switch: Manual de iniciação (37 páginas), Manual de iniciação (31 páginas), Especificação rápida (12 páginas), Nota de lançamento (41 páginas), Nota de lançamento (27 páginas), Nota de lançamento (23 páginas), Nota de lançamento (21 páginas)

Cisco 3020 - Cisco Catalyst Blade Switch Manual de instalação

Installing the Switch Module in the Blade Server

Installing the Switch Module in the Blade Server
Before you install the switch module in the blade server, consider these points:
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Warning
Statement 1030
Caution
To prevent electrostatic-discharge (ESD) damage when installing switch modules, follow your normal
board and component handling procedures.
Note
Follow these steps to install the switch module in the blade server:
If you have not already done so, touch the static-protective package that contains the switch module to
Step 1
an unpainted metal part of the blade server for at least 2 seconds.
Remove the switch module from its static-protective package.
Step 2
Remove the interconnect blank from the bay where you plan to install the switch module, if one is
Step 3
present, and install the switch module. (See
Cisco Catalyst Blade Switch 3020 for HP Hardware Installation Guide
2-6
Review and become familiar with the safety guidelines in the Regulatory Compliance and Safety
Information for the Cisco Catalyst Blade Switch 3020 for HP that accompanies this guide.
Review and become familiar with the safety guidelines in the HP BladeSystem enclosure setup and
installation guide.
Review and become familiar with the temperature, power, and grounding requirements specified in
the HP BladeSystem enclosure setup and installation guide.
When you install a switch module, you do not need to power down the blade server.
Figure
2-2.)
Chapter 2
Switch Installation
OL-8914-02