Chapter 4
Installing a Cisco 6160 Without a POTS Splitter Configuration
Insert the battery return wire from the first external power source into the receptacle labeled + (positive)
Step 4
on the appropriate power terminal block (Callout 2 in
fully inserted so that no bare wire is exposed.
Figure 4-9
1
2
3
1
Power lead wire connection
2
Battery return wire connection
Verify that no wire strands are left outside the connector.
Step 5
Use a flat-head screwdriver and a clockwise motion to tighten the terminal screw over the wire.
Step 6
Insert the power lead from the first battery –48VDC power source into the receptacle labeled – (negative)
Step 7
on the appropriate power terminal block (Callout 1 in
fully inserted so that no bare wire is exposed.
Step 8
Verify that no wire strands are left outside the connector.
Use a flat-head screwdriver and a clockwise motion to tighten the terminal screw over the wire.
Step 9
If you are connecting a second power source, repeat
Step 10
terminal block.
Thread tie wraps through the small cutouts in the side of the chassis next to each terminal block and tie
Step 11
down the wires using the tie wraps.
Step 12
Repeat
OL-2190-02 B0
Inserting the Grounding and Power Wires into the Power Terminal Block Connector
PEM 1
-48/-60V
35A
, 1280VA
Step 1
through
Step 11
for each Cisco 6160 chassis being installed.
Figure
4-9). The stripped part of the wire must be
3
Grounding wire connection
Figure
4-9). The stripped part of the wire must be
Step 2
through
Step 9
to wire the second power
Cisco 6160 Hardware Installation Guide
Installation Procedures
4-13