Cisco 7513 Series Manual de instruções de substituição - Página 17

Procurar online ou descarregar pdf Manual de instruções de substituição para Servidor Cisco 7513 Series. Cisco 7513 Series 22 páginas. Chassis replacement
Também para Cisco 7513 Series: Manual de início rápido (44 páginas), Manual de instruções de substituição (26 páginas), Ficha de dados (11 páginas), Manual (30 páginas), Atualização (20 páginas), Manual de instruções de substituição (19 páginas)

Cisco 7513 Series Manual de instruções de substituição

Checking the Installation

To complete the replacement procedure, perform the following steps to verify that the system is
functioning properly. These steps will also help you verify that all the processor modules you moved
are returned to their previous state. For additional first-time startup troubleshooting procedures, refer
to the Cisco 7513 Hardware Installation and Maintenance publications.
Because the lithium battery backup on the RSP2 retains the system configuration in NVRAM, the
system and the individual interfaces should come up in their previous configuration, provided that
you installed the interface processors in the same slots they occupied in the old chassis.
If, however, you installed interface processors in different slot positions in the new chassis, the
system will recognize the interfaces, but will leave them in a down state until you reconfigure and
enable them.
If you need technical assistance, refer to the section "Cisco Information Online" at the end of this
document.
Step 1
Step 2
Step 3
Step 4
Figure 9
Ensure that the system power switch is in the off position, then reconnect the power cable
to the AC receptacle or DC terminal block, as required. For the AC-input power supply,
snap the cable retention clip up around the plug to secure the cable. For the DC-input power
supply, reattach a new nylon cable tie to support the weight of the cable.
Connect all interface cables to the appropriate interface processor ports. Ensure that all
cables are fully seated in the ports and that all strain relief systems are engaged.
Ensure that you have either a console terminal connected to the system console port or a
port available for a Telnet session to the router.
Turn ON the system power. On the power supplies, the (AC or DC) OK LED should go on
and stay on. (See Figure 9.)
Power Supply LEDs (AC-Input Power Supply Faceplate Shown)
A C
F A N O U T P U
T
O K
LEDs
O K
F A IL
AC power
receptacle
Power
switch
For the DC-input
power supply
D C
F A N O U T P U
O K
O K
F A IL
AC
FAN OUT PUT
OK
OK
FAI L
Captive
installation
screw
Cisco 7513 Chassis Replacement Instructions
Replacing the Chassis
T
Power supply
front panel
17