Cisco SCE8000 GBE Manual de início rápido - Página 2
Procurar online ou descarregar pdf Manual de início rápido para Servidor Cisco SCE8000 GBE. Cisco SCE8000 GBE 25 páginas. 10gbe platform
Também para Cisco SCE8000 GBE: Manual de configuração (18 páginas), Procedimentos de remoção e substituição (36 páginas), Instalação (21 páginas)
Revised: December, 2008, Release 3.1.7, OL-16595-02
1
Preparing for Installation
This section contains warnings, tools and part information, and site preparation details.
Warning
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any
equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for
preventing accidents.
Warning
Only trained and qualified personnel should install, replace, or service this equipment.
Warning
Read the installation instructions before you connect the system to its power source.
Warning
This unit is intended for installation in restricted access areas. A restricted access area is where access can only
be gained by service personnel through the use of a special tool, lock and key, or other means of security, and is
controlled by the authority responsible for the location.
Warning
Voltage is present on the backplane when the system is operating. To reduce risk of an electric shock, keep hands
and fingers out of the power supply bays and backplane areas.
Warning
Do not work on the system or connect or disconnect cables during periods of lightning activity.
Warning
Before you begin the installation of the SCE8000, read the
Cisco SCE8000 Platform
Site Preparation
• Verify that the power service at the site is suitable for the SCE8000 chassis.
• Print out and have accessible the
SCE8000 Installation and Configuration Guide
Tools and Parts
Use the following list of tools and parts as a checklist for preparing to install the SCE 8000 chassis:
• Number 1 and number 2 Phillips screwdrivers
• 3/16-inch flat-blade screwdriver
• Tape measure and level
• Masking tape or some other method of marking the desired installation height in the rack
• One grounding lug
• Two M4 (metric) hex-head screws with locking washers
2
document.
Site Planning Checklist
and the
to record information about this installation.
Regulatory Compliance and Safety Information for the
Cisco SCE8000 Installation Checklist
from the
Cisco