Lenovo SE350 Manual de configuração e instalação - Página 7

Procurar online ou descarregar pdf Manual de configuração e instalação para Servidor Lenovo SE350. Lenovo SE350 24 páginas. Toolless friction rail v2
Também para Lenovo SE350: Início rápido (2 páginas), Manual (12 páginas), Manual (8 páginas)

Lenovo SE350 Manual de configuração e instalação
DIN Rail Configuration
This document provides important information for installing and removing the DIN rail configuration.
Install the DIN rail configuration
To install the DIN rail configuration, complete the following steps.
Note: Reserve 500 mm empty space in front of the node so that you can have sufficient space to install and remove the node.
1.
Install the two DIN rail clips to the power adapter bracket or the node sleeve depending on your configuration.
If you are installing the node sleeve without the power adapter bracket, complete the following steps.
Align the two DIN rail clips with the node sleeve.
Insert and tighten the four screws.
If you are installing the node sleeve with the power adapter bracket, complete the following steps.
Align the two DIN rail clips with the power adapter bracket.
Insert and tighten the four screws.
Note: You can install the DIN rail clips horizontally or vertically as below according to your DIN rail setting.
7