4 INSTALLATION
PROTECTIVE GEAR REQUIREMENTS
Wearing floating garments is mandatory when working on or by the sea.
After completing SJA, and if measures have been introduced for the transport to and
from the cage may be carried out in a safe manner, work can be commenced.
4.1 PREPARATIONS
Before commencing the installation process, site manager and owner and site manager are
responsible for ensuring that everyone who installs and/or uses the AKVA Subsea Feeder is
informed of and understands the contents of this manual before commencing the installation.
Before using the feeder, check all components for potential damages caused during storage or
transportation. Never place a damaged unit inside a pen.
Before commencing the installation, check that the pump is in the correct vertical position and
the AKVA Subsea Feeder is positioned upright.
The feeder is supplied with the relevant equipment for installation. Control wether the delivery
note corresponds with the amounts and sizes of the materials supplied, such as:
-
bolts
-
hose clamps
-
wrenches
-
loading straps
-
pump with hose
-
hex wrench for hose clamps
In rough weather (waves and strong currents), the AKVA Subsea Feeder must be moored at a
45-degree angle against the weather direction, as shown in illustration 6:
Subsea Feeder 45 degrees against the weather
Illustration 6:
Mooring the AKVA Subsea Feeder 45 degrees against the weather direction