COLDBUSTER FLOORHEATING Timber Руководство по установке - Страница 6

Просмотреть онлайн или скачать pdf Руководство по установке для Нагреватель COLDBUSTER FLOORHEATING Timber. COLDBUSTER FLOORHEATING Timber 16 страниц.

Floor Preparation

This guide intends to serve only as an outline for the most common floor preparation required.
Please contact us for any additional advice.

Concrete Subfloor Preparation

• The concrete must be completely cured (this can take up to 8 weeks)
• The floor surface must be smooth, unpainted and free of dust, oil, grease, tar and glue residues
• Clean and sweep or vacuum floor surface

Timber Subfloor Preparation

• The floor should be rigid and free from movement
• Install a fibre cement underlay or insulation board over the timber structural floor before tiling
• The floor surface must be smooth, unpainted and free of dust, oil, grease, tar and glue residues
• Clean and sweep or vacuum floor surface
• After the heating is placed, Coldbuster recommends laying a 10-15mm sand cement or liquid
leveller over the heater so there is a medium between the heating element and the flooring
Prepping Subfloor Surface with a Bonding Liquid
(If heater(s) don't stick due to dusty floor surface)
1. Apply a coat of bonding liquid mixed 1:4 with water using a paint roller & tray (avoid ponding),
2. Allow bonding liquid to dry completely before installing heater(s)
6