Andisoon Measure T635 Series Руководство пользователя - Страница 5

Просмотреть онлайн или скачать pdf Руководство пользователя для Промышленное оборудование Andisoon Measure T635 Series. Andisoon Measure T635 Series 10 страниц. Hydrogen refueling nozzle

refueling nozzle and the sealing surface of the conical surface of the
hydrogen refueling hose with a clean and dust-free cloth to avoid the
sealing failure caused by impurities damaging the sealing surface
during the connection process;
5、 After the hydrogen refueling hose and the hydrogen refueling hose are
initially connected by hand, the S = 13 explosion-proof solid wrench is
used to block the hexagonal position of the inlet connector, and the S =
19 explosion-proof solid wrench (the size of different brands of hose is
different) is used to block the hexagonal nut of the hydrogen refueling
hose. Keep the S = 13 solid wrench still, and turn the S = 19 solid
wrench to make the two connect in place; connect the quick connector
of the power line of the infrared communication module. After
completion, pay attention to checking whether the connection between
the hydrogen refueling hose, the hydrogenation gun as well as the
quick connector of the power line of infrared communication module is
firm and reliable;
6、 Control the main pipeline valve of the hydrogen dispenser to slowly
refuel part of hydrogen into the hydrogen refueling nozzle, and use the
hydrogen detector to detect whether there is leakage in the connection
between the hydrogen refueling nozzle and the hydrogen dispenser. If
any, turn off the main pipeline valve of the hydrogen dispenser and
operate the vent valve in the hydrogen dispenser, release the internal
pressure of the hydrogen refueling nozzle completely, and then slightly
tighten the connection between the hose and the hydrogen refueling
nozzle. Repeat the above operation till no leakage is detected at the
connection. Repeatedly operate the main pipeline valve and vent valve
of the hydrogen dispenser for more than 5 times to complete the gas
replacement inside the channel of the hydrogen refueling nozzle. At
the same time, check whether the infrared communication module and
the
hydrogen
communication is not possible, please check the connectors and
related lines;
7、 According to the direction where the hose sheath is removed, the hose
sheath and the main body of the hydrogen refueling nozzle are
assembled and fastened;
8、 At this point, the connection between the hydrogen refueling nozzle
and the hydrogen dispenser is completed.
dispenser
can
3
communicate
normally.
If
the