Atlantic SP1600 Руководство по эксплуатации - Страница 10
Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Газонное и садовое оборудование Atlantic SP1600. Atlantic SP1600 16 страниц. Oasis series skimmer, filterfalls, pump vault, fastfalls
Также для Atlantic SP1600: Руководство по эксплуатации (12 страниц)
Attach the liner flange to the FilterFalls, starting with the center screw first, and then work
out toward the sides of the spillway. It may be necessary to first pierce the liner with a nail
or an awl before inserting the screw. Do not fully tighten any screws until all the screws have
been installed. Once completed, trim away any excess liner as needed.
Tighten flange screws with a hand held screwdriver only. Over tightening the screws
could strip out the inserts or crack the liner flange. The screws need only to be snug
for the silicone to make a seal.
POND-FREE
Pond–free features exchange the open water of the pond for a gravel-topped excavation,
maximizing visual impact while minimizing headaches and maintenance. Typically, a pump
placed in a protective vault inside a lined reservoir continuously recirculates water over a
stream or waterfall. A bed of gravel hides the basin, vault and plumbing from view, leaving
only the stream and waterfall visible.
ECO-BLOX vs. GRAVEL BASIN for a WATERFALL or STREAM
Eco-Blox basins consist of 10% Eco-Blox and 90% water. Gravel basins consist of 70% rock
and only 30% water. As a rule of thumb, your pond-free basin should hold three times
the amount of water as the waterfalls and streambeds above it. It is critical to calculate
the water volume that the basin can hold before you begin construction of the waterfalls
or streambed.
Why should the basin be three times the size of the stream? Upon start-up, the pump
sends water from the bottom reservoir to the top of the waterfall and/or streambed. The
water must then fill, from top to bottom, the waterfalls and streambed until it eventually
re-enters the basin and the water levels equalize. During this filling process, the water level
of the bottom reservoir is continually dropping.
If the streambed is built improperly, or is built too big, the water level of the bottom
reservoir may drop below the top of the pump before the water levels equalize. This would
result in the top of the pump being exposed to air. Pumps must be completely submersed
in water or they can overheat causing damage to the pump. Refer to the streambed
construction section on page 5 for more detail.
STREAMBED VOLUME
Multiply (in feet) the average length x the average width x the average depth to find
cubic feet of streambed volume
Don't forget that the thickness of your rocks will add extra depth to the water.
(e.g. if you have rocks 1" deep covering the bottom of your stream, be sure to
incorporate that 1" into your total depth)
BASIN VOLUME
For Eco-Blox: Multiply the cubic feet of the streambed x 3 = cubic feet needed for the basin
For Gravel: Multiply the cubic feet of the streambed x 9 = cubic feet needed for the basin
10
2" DEEP = 0.16'
3" DEEP = 0.25'
4" DEEP = 0.33'
Cubic feet ÷ 4.2 = the number of Eco-Blox
Cubic feet ÷19 = the number of tons of gravel