ABSCO SHEDS CPDW50 Руководство по сборке и эксплуатации - Страница 9
Просмотреть онлайн или скачать pdf Руководство по сборке и эксплуатации для Палатка ABSCO SHEDS CPDW50. ABSCO SHEDS CPDW50 19 страниц. Skillion carport
STEP 3.
MARK OFF THE SIDE BEAMS TO THE DIMENSIONS SHOWN BELOW. THESE ARE THE
POSITIONS FOR LOCATING THE COLUMN TOP BRACKETS, TO WHICH THE COLUMNS AND
CROSS BEAMS WILL BE LATER CONNECTED.
REAR
THE REAR RHS COLUMNS ARE 50mm SHORTER THAN THE FRONT RHS COLUMNS.
THIS PRODUCES ABOUT A ONE DEGREE FALL IN THE ROOF, TO ALLOW RAINWATER
TO FLOW TO THE REAR DOWNPIPE.
THEREFORE, TO ENSURE THAT THE COLUMNS WILL REMAIN VERTICAL WHEN THE
STRUCTURE IS RAISED, EACH COLUMN TOP BRACKET MUST BE OFFSET BY 6mm AS
SHOWN BELOW. YOU CAN SEE BELOW HOW THE END RESULT WILL KEEP THE COLUMNS
VERTICAL BUT TILT THE ROOF.
FLUSH WITH INSIDE
FLANGE AT THIS POINT
REAR
STEP 3A.
REAR
MARK THE HOLE POSITIONS FOR THE FOUR HOLES TO BE DRILLED IN THE BEAMS AT
EACH LOCATION, AND DRILL 10mm HOLES. DO NOT FASTEN THE COLUMN TOP
BRACKETS TO THE EDGE BEAMS AT THIS STAGE.
ABSCO INDUSTRIES
Skillion Carport Model: CPDW50
SIDE
ASSEMBLY INSTRUCTION MANUAL
Absco Industries
SIDE
FLUSH WITH INSIDE
FLANGE AT THIS POINT
CENTRE
FIT AN EXTRA SPLICE PLATE IN EACH SIDE EDGE
BEAM, OVER THE FRONT AND REAR COLUMN
POSITIONS AND FASTEN WITH TEK SCREWS.
FRONT
CARPORT MODEL: CPDW50
THIS SET OF FOUR
HOLES MUST MATCH
THE FOUR HOLES IN
THE CROSS BEAM.
FRONT
FLUSH WITH INSIDE
FLANGE AT THIS POINT
FRONT
10-05-2017
PAGE 09