AddEnergie CoRe+ Руководство по установке - Страница 2

Просмотреть онлайн или скачать pdf Руководство по установке для Кабели и разъемы AddEnergie CoRe+. AddEnergie CoRe+ 2 страницы. Cascading on a 150a circuit

STEP 3:
p
edestal and charging station installation
• Slide the pedestal over the assembly, making sure
that the terminal blocks are facing the access door at the
bottom of the pedestal.
• Tighten the 4 mounting nuts that secure everything to
the anchor.
• Unscrew and remove the plate(s) from the top of the
pedestal, depending on the number of charging stations
to install.
• Pass the power supply wires (2 lines and 2 ground
connector) from each rectangular hole at the top of the
pedestal down to the breakers.
• Connect the wires feeding the charging stations to their
respective breakers, being careful to keep the phases
balanced (in the case of a tri-phase supply) and install
each charging station on the pedestal, as per the
charging station installation guide.
© 2015 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice.