Duerkopp Adler 745-23 Инструкции по установке и список запасных частей - Страница 10

Просмотреть онлайн или скачать pdf Инструкции по установке и список запасных частей для Швейная машина Duerkopp Adler 745-23. Duerkopp Adler 745-23 14 страниц.

Duerkopp Adler 745-23 Инструкции по установке и список запасных частей

4. Electrical Connection

4.1 Attaching the Microcontrol Control Unit
1
10
ATTENTION !
All work on the electrical components of the sewing unit may only be
conducted by electricians or appropriately instructed persons.
The mains plug must be pulled.
The Microcontrol control unit is fastened onto plate 1 with the set
screws 2.
2
Place the Microcontrol control unit on the plate 1.
Secure the set screws 2 on the underside of plate 1 with washers
and nuts.
Make the cable connection.
Attention !
Carefully insert the plugs into the back of the control unit.
In as far as these exist observe the same designations on the
cables and the back.
Also observe the differing outfitting of the plugs with contact pins
and contact sockets, as well as their number and arrangement.
Tighten the screws of the plugs.