Galvin Engineering Ezy-Wash TF81HJP Установка изделия Manualline - Страница 2

Просмотреть онлайн или скачать pdf Установка изделия Manualline для Сантехническая продукция Galvin Engineering Ezy-Wash TF81HJP. Galvin Engineering Ezy-Wash TF81HJP 5 страниц. Pre-rinse tapware

Galvin Engineering Ezy-Wash TF81HJP Установка изделия Manualline
Version 1, 3 August 2017, Page 2 of 5

PRE-INSTALLATION

Body:
If the mounting hole does not already exist,
mark out and drill the hole in the bench, as
shown.
This model is a single inlet unit requiring a hole
diameter of 23 to 26mm. Ensure 70mm
minimum between wall and hole center as
shown "A".
Maximum bench thickness is 50mm.
Wall Bracket:
Mark out the three (3) holes for mounting the
wall bracket assembly at a height of between
430mm min - 520mm max directly up from the
bench. Cut out or drill as shown in the image.
(Supplied fasteners may not be suitable for the
mounting surface. If this is the case, suitable
fasteners will need to be sourced by the
installer)
Note: We recommend the wall bracket is installed
at the maximum of 520mm. The wall bracket can be
mounted lower at a height of up to 90mm below the
circlip. However, the further it is mounted away
from the circlip, the more the stability of the unit is
compromised.
TF81HJS – Assembly
Version 2, 3 August 2017, Page 2 of 5

MOUNTING DETAILS

TF81HJP - Assembly