Aqua Creek Products F-004PLB-XR Руководство - Страница 5
Просмотреть онлайн или скачать pdf Руководство для Подъемные системы Aqua Creek Products F-004PLB-XR. Aqua Creek Products F-004PLB-XR 20 страниц.
NOTE: FOR DECKS 6" THICK OR MORE, 2500PSI MINIMUM STRENGTH CONCRETE REQUIRED
Core drill and 1 ½" core drill bit
Marking pen
Cold chisel
Masking tape
Black electrical tape (optional)
*Aqua Creek recommends either Hilti™ Brand HIT RE-500-SD or Simpson™ brand SET-XP or equivalent (not included)
1. Locate the anchor jig-plate, and three (3) anchor bolts with mounting hardware. (If sold
separately from lift, part number F-910SAJP).
2. Using the larger holes in the anchor jig-plate as a template, mark the three hole locations with
a marking pen on the pool deck. Verify the CENTER LINE OF THE ANCHORS are no more than 38
inches from the pools edge. See FIGURE 1, page 4.
3. Using the core drill and the 1 1/2" core drill bit, drill out the three hole locations marked on the
pool deck to a depth of about 4 1/2".
bolts are ush with the BOTTOM of the jig-plate (see diagram on left). IMPORTANT: Use the
enclosed packet of anti-seize lube on the threads of the hardware to prevent the hardware from
seizing in the anchor inserts.
Copyright © 2014 Aqua Creek Products All Rights Reserved
Required Tools:
Tape measure
Hammer
Torpedo level
High strength 2-part construction epoxy*
a. NOTE: Use black electrical tape on the end of the
drill bit as a visual marker to indicate the proper depth needed
to drill to.
b. NOTE: Depending on local grounding requirements,
one hole may need to be drilled larger than the others so
at least one of the anchor inserts is grounded. One anchor insert is
provided with a bonding screw to assist with this step. In some
cases saw cutting a portion of the deck out
completely might be required. In this case, follow the "Saw
Cutting Retro-Fit Instructions".
4. Remove the core from the holes using a hammer and chisel.
The holes should be completely dry and clear of any debris
before installing the anchors into them.
5. Remove the nuts from the threaded anchor bolts and the black
protective cover from the end of the anchor bolt, exposing the
internal threads that will accept the mounting hardware.
6. Using the smaller holes in the anchor jig-plate, thread the
mounting hardware through the anchor jig-plate holes and
into the ends of the three anchor bolts so the tops of the
continued on page 6
Revised 11/20/14
5
V.1.1