Aqua Creek Products Power EZ 2 Руководство - Страница 4
Просмотреть онлайн или скачать pdf Руководство для Подъемные системы Aqua Creek Products Power EZ 2. Aqua Creek Products Power EZ 2 11 страниц. Pool lift and hard seat option
Также для Aqua Creek Products Power EZ 2: Руководство (16 страниц), Руководство (11 страниц), Руководство (12 страниц)
STEP 5. Locate the chain assembly and insert each "S" hook
into the holes in the sling support bars (A).
Attach the hanger to the boom eye on the lift (B).
Adjust the chain links so that the sling is at the
appropriate height to allow the user easy access (C).
This may require several adjustments. Also, be
mindful of any obstacles such as coping or a gutter
that will need to be cleared.
STEP 6. Attach the handset controller plug at the base of
the control box. Press fi rmly until plug is fully seated in the
control box.
STEP 7. Slide the EZ turn bar into the attachment bracket.
Mount the FULLY CHARGED 24V battery on top of the control
box. When properly mounted the battery will lock in place,
causing a 'click' sound, and will sit fl ush and square with the
control box.
ATTENTION! THE BATTERY MUST BE CHARGED FOR 24
HOURS BEFORE FIRST USE. STORE THE BATTERY ON THE
CHARGER AND NEVER LEAVE THE BATTERY ON THE LIFT
WHEN NOT IN USE.
Assembly is complete. Prior to lifting any persons, it is
recommended that the lift be operated once without a load
to check for proper functioning (and that the instructions for
operating the lift be read and incorporated into a training
program for the persons who will be operating the lift). For
any person operating the lift, please continue to operating
instructions. Read carefully for comprehension.
Copyright © 2017 Aqua Creek Products All Rights Reserved
Assembly Instructions
STEP 5
STEP 5
STEP 6
STEP 7
STEP 7
24V BATTERY
(CHARGED)
EZ TURN
BAR
Revised 4/3/17
B
C
A
4