Dell EMC Edge 510 LTE Руководство по установке - Страница 13
Просмотреть онлайн или скачать pdf Руководство по установке для Переключатель Dell EMC Edge 510 LTE. Dell EMC Edge 510 LTE 24 страницы. Networking switch
Также для Dell EMC Edge 510 LTE: Руководство по настройке (8 страниц)
WARNING:
When mounting the platform to the wall, face the Ethernet ports up towards the ceiling and the
system status LED panel down, facing the floor.
Keyhole-shaped bracket installation
Rack mount
As an option, you can mount the Edge 510 LTE platform to a dual rackmount tray. Purchase the dual rackmount tray separately.
You must have a torque screwdriver to complete this installation.
NOTE:
Verify that you torque to 5 lb-in when driving the screws into the bracket and platform.
NOTE:
Remove the rubber feet from the bottom of the platform when mounting on a rack mount tray.
NOTE:
Ensure that the platform is in a well-ventilated environment with clearance around the air vents.
1. Place one or two Edge 510 LTE platforms in the dual rackmount tray.
Edge 510 LTE installation
13