Site Preparations
The S55 is suitable for installation as part of a Common Bond Network (CBN). It can be installed in:
• network telecommunication facilities
• data centers
• other locations where the National Electric Code (NEC) applies
This chapter covers the following topics:
•
Site selection
•
Cabinet placement
•
Rack mounting
•
Grounding
•
Fans and airflow
•
Power
•
Storing components
For detailed S55 specifications, refer to
NOTE: Install the S55 unit into a rack or cabinet before installing any optional components.
Site selection
Dell Force10 equipment is intended for installation in restricted access areas. A restricted access area is
one in which access can only be gained by service personnel through the use of a special tool, lock, key or
other means of security and access is controlled by the authority responsible for the location.
Make sure that the area where you install your S55 chassis meets the following safety requirements:
• Near an adequate power source. Connect the system to the appropriate branch circuit protection as
defined by your local electrical codes.
• Environmental temperature between
• Relative humidity that does not exceed 85% non-condensing.
• In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air
vents or direct sunlight.
• Away from sources of severe electromagnetic noise.
• Positioned in a rack or cabinet, or on a desktop with adequate space in the front, rear, and sides of the
unit for proper ventilation, and access.
Chapter 8, S55
Specifications.
32° to 104°F (0° to 40°C)
.
3
Site Preparations
|