Cisco ASR 920 series Руководство по установке - Страница 30

Просмотреть онлайн или скачать pdf Руководство по установке для Переключатель Cisco ASR 920 series. Cisco ASR 920 series 42 страницы. Aggregation services router
Также для Cisco ASR 920 series: Руководство по установке (36 страниц), Начало работы (6 страниц), Руководство по установке оборудования (46 страниц), Руководство (36 страниц)

Cisco ASR 920 series Руководство по установке
Activate a DC Power Supply
Use the information in the table below to estimate the power requirements and heat dissipation of a router is
based on a given configuration of the router. Determining power requirements is useful for planning the power
distribution system needed to support the router.
Activate a DC Power Supply
Perform the following procedure to activate a DC power supply:
SUMMARY STEPS
1. Remove the tape from the circuit-breaker router handle, and restore power by moving the circuit-breaker
router handle to the On (|) position.
2. Verify power supply operation by checking if the respective power supply front panel LED (PS0 or PS1)
is green.
3. If the LEDs indicate a power problem, see
4. If you are connecting a redundant DC power supply, repeat these steps for the second power source.
DETAILED STEPS
Step 1
Remove the tape from the circuit-breaker router handle, and restore power by moving the circuit-breaker router handle
to the On (|) position.
Step 2
Verify power supply operation by checking if the respective power supply front panel LED (PS0 or PS1) is green.
Step 3
If the LEDs indicate a power problem, see
Step 4
If you are connecting a redundant DC power supply, repeat these steps for the second power source.
If you are connecting a redundant DC power supply, ensure that each power supply is connected to a separate
Note
power source in order to prevent power loss in the event of a power failure.
Activate an AC Power Supply
Perform the following procedure to activate an AC power supply:
SUMMARY STEPS
1. Plug the power cord into the power supply.
2. Connect the other end of the power cord to an AC-input power source.
3. Verify power supply operation by checking if the respective power supply front panel LED (PS0 or PS1)
is green.
4. If the LEDs indicate a power problem, see
5. If you are connecting a redundant AC power supply, repeat these steps for the second power source.
Cisco ASR 920 Series Aggregation Services Router Hardware Installation Guide
30
Chapter 5, "Troubleshooting."
Chapter 5, "Troubleshooting."
Chapter 5, "Troubleshooting"
Installing the Cisco ASR 920 Series Router
for troubleshooting information.
for troubleshooting information.
for troubleshooting information.